One corner down…
By avi On February 27th, 2010Three corners to go. This was the “hardest” part since it required four of us to do.


Three corners to go. This was the “hardest” part since it required four of us to do.

Here goes the framing of the first wall.
2×6 framing 24″ centers. Three stud corners. Four anchor bolts per wall.
This Observatory is built better than most new homes in our area, lol!
The large gap to the left is for the exterior door.

So we’ve dealt with the wettest winter in central Arizona in many, many years.
Now that things have dried out, I was able to go from this:

To THIS: